The problem 10 ft

Every winter, someone opens the fuel bill and does the math twice.


If your operation heats or cools around the clock, whether that is a barn, a plant, a warehouse, a rink or a campus, energy sits near the top of your operating costs. It is also the cost you control least. Propane, oil and natural gas prices move with the weather, with exports and with events a long way from your site.

The chart shows what that looks like over 25 years. Propane more than doubled from 2020 to 2021. Natural gas swung more than fourfold between its cheapest and dearest years. Try budgeting a decade against that.

What a Unit of Heat Cost in Fuel

Annual Average Spot Price, $ per Million Btu
Interactive graphic. It appears on the live site and in page preview; Squarespace does not run it in the editor.

Source: U.S. Energy Information Administration, annual average spot prices: Mont Belvieu, TX propane (converted at 91,452 Btu per gallon) and Henry Hub natural gas, 2000 to 2025. Wholesale prices; delivered prices to your site run higher.

Price Spikes

A cold snap or a supply shock you can't plan for can wipe out a season's margin. Prices that stay high squeeze you for years after.

Paying Twice for Heat

Plenty of sites burn fuel to make heat while their chillers and compressors throw heat away outside. That heat is worth keeping.

Equipment on a Clock

Boilers, chillers and refrigeration plants wear out. Replacement day decides what you pay for energy for the next few decades.

Who we serve 25 ft

Three kinds of site. One kind of load.


A dairy barn, a distribution center and an ice rink look nothing alike from the road. Underneath, many share the same profile: heating and cooling that run most of the year, often both at once. That profile is what we look for, wherever it sits.

Farms, growers and packhouses

Barns, grow rooms and on-farm processing that need warmth every day and cooling at the same time.

  • Dairy farms and creameries
  • Mushroom growers
  • Greenhouses on propane or oil
  • Poultry and egg hatcheries
  • Swine and calf barns
  • Aquaculture and fish hatcheries
  • Produce packhouses and ripening

Already working elsewhere

Dairy milk cooling. Ground-water milk pre-cooling is a standard Efficiency Vermont measure, cutting cooling energy by about half.
Fruit packing. Gebbers Farms' apple pre-size facility in Washington has run on a geoexchange system since 2009.
Cheese making. Fifth Town Artisan Cheese in Ontario heats and cools its plant with a ground-source system and no backup boiler.

Plants, warehouses and cold storage

Large buildings that heat all winter while machines, coolers and docks need cooling all year.

  • Manufacturing: space heating and process cooling
  • Food and beverage processing
  • Distribution and warehousing
  • Cold storage
  • Breweries, wineries and distilleries
  • Commercial laundries
  • Wastewater treatment plants

Already working elsewhere

Logistics. Marine Corps Logistics Base Albany, Georgia: 306 boreholes and a 30% lower electricity bill (U.S. Department of Energy case study).
Electronics manufacturing. Delta Electronics conditions its 175,000 sq ft Fremont, California facility with a ground loop (DOE case study).
Process cooling. VILPE in Finland cools its production machines and molds with water from boreholes.

Retail, rinks, campuses and public buildings

Buildings open long hours that freeze ice beside a warm lobby, heat a pool all winter or plan their budgets years ahead.

  • Big box retail
  • Ice rinks and aquatic centers
  • Senior-living and county nursing homes
  • Hotels with pools and laundry
  • Corporate and university campuses
  • Correctional facilities
  • Aquariums and zoos

Already working elsewhere

Big box retail. IKEA Centennial, Colorado has heated and cooled its store from 130 geothermal wells since 2011.
Retail. A Walmart in Burlington, Ontario runs on a ground loop under its parking lot, with HVAC savings reported at 57% against earlier stores.
Corporate campus. Epic Systems in Verona, Wisconsin cools a 3.5 MW data center through its 6,100-well geothermal system (DOE case study).

These installations belong to other owners and operators. They are not Fifty Under projects.

Where the Fit Is Strongest

Where ground-source heating and cooling pays best today, scored the same way for all three. Hover or tap a state for its tier and how its heat costs compare.
Interactive graphic. It appears on the live site and in page preview; Squarespace does not run it in the editor.
Tier 1: strongest fitTier 2: good fitTier 3: case by caseNot ranked

State boundaries: U.S. Census Bureau. Alaska and Hawaii shown inset, not to scale.

Off the gas mainHeating with propane, heating oil or electric resistance today.
Equipment due for replacementA boiler, chiller or refrigeration plant near the end of its life.
Long running hoursHeating or cooling most of the year, ideally both at once.

If your site does not tick at least one of these, a ground loop may not be your best answer, and we will tell you so.

The resource 50 ft

The answer has been under your feet the whole time.


Above ground, temperatures swing from below zero in January to the 90s in July. Dig down and those swings fade. By about fifty feet, the ground holds steady all year: near 50°F across much of the northern U.S., and warmer farther south. A ground-source heat pump uses that steady temperature to move heat rather than make it: out of the ground in winter, back into it in summer.

Heat Pump 50 ft: Near 50°F All Year 10 ft: Swings Shrink Bores Typically 200 to 400 ft Deep, About 5 Inches Across Yearly Temperature Swing
Illustrative cross-section, not to scale. Typical vertical bores run 200 to 400 ft deep and about 5 inches across (Oak Ridge National Laboratory survey). Ground temperature at depth follows the local yearly average air temperature: near 50°F across much of the northern U.S., higher in the South.Orange: Warmer Fluid. Blue: Cooler Fluid.

How it works 100 ft

We develop it with partners. You pay for the heat and cooling.


Fifty Under develops ground-source projects. We work with engineers, drillers, installers, operators and capital providers to bring each one together, wherever your site is. With Geothermal-as-a-Service, the project is funded through our capital partners, so you put no money down. You pay a per-unit rate, the REF, for the heating and cooling you use, set for the term of the agreement with its escalator.

Your energy cost stops riding the fuel market. And because a ground-source heat pump moves heat rather than making it, it uses about a quarter of the electricity of electric resistance heat. Your power rate decides how much of the saving you keep, not whether the switch makes sense.

Interactive graphic. It appears on the live site and in page preview; Squarespace does not run it in the editor.
01 · DESIGN

Sized to your loads

We lead the design with our engineering partners. Where you heat and cool at the same time, heat recovery comes first. The ground loop carries the everyday load, and a peaking boiler covers the coldest days. You don't pay for loop you don't need.

02 · FUND AND BUILD

The right partners, your site

We bring together the capital, incentives, drilling and installation partners each project needs, and plan the build around your operation, not through it.

03 · OPERATE

Run for the long haul

Our operations partners handle monitoring, maintenance, parts and major overhauls for the life of the agreement, backed by a performance guarantee.

Federal tax credit

The economics come first. The credit makes them better.

A ground-source system earns its place by cutting what you spend on heating and cooling, year after year. The federal investment tax credit then lowers what the system costs to build. When the 2025 tax law (the One Big Beautiful Bill Act) wound down credits for solar and wind, it left the commercial credit for geothermal heat pumps in place under Section 48, for projects that begin construction before 2035.

The rate depends on project size, wage and apprenticeship rules and bonus eligibility. How bonus credits combine is still being settled, so every project is confirmed with tax counsel. The 2025 law also ended five-year accelerated depreciation for these systems. This is not tax advice.

30% to 50%of eligible project cost. 30% for most projects, up to 50% where bonus credits for domestic content or an energy community apply.

Service isn't the only way.

Some operations are better off owning the system outright, sharing ownership, or starting with one building and growing from there. We'll put the options side by side, with the numbers, and work out with you which one fits your operation and your balance sheet.

Project screening 200 ft

Know if it makes sense before anyone spends real money.


Our AI-powered screening tool pulls together what can be known about your site: climate, ground conditions, the heating and cooling a site like yours typically needs, local fuel prices, electricity rates and the incentives you could qualify for. You get a fast, honest read on whether a project makes sense and what the outlook looks like.

Every figure is marked by where it came from, so you always know what is public data, what came from your records and what is our estimate.

It all starts with a conversation. We only ask for an NDA once we have talked and, in most cases, once the quick screen shows a project worth pursuing.

Fifty Under Site Screen
Example: A 300-Cow Dairy, Upstate New YorkIllustrative only. Not a real site.
Climate and Heating Season
Public data
Soil, Rock and Ground Conditions
Public data
Heating and Cooling Loads by Season
Our estimate
Fuel Prices and Electricity Rate
Public data
Incentives the Site Could Qualify For
Public data
Your Bills and Metered Loads
After Intro Call and NDA
Outlook: Worth a Closer Look. Milk cooling and parlor hot water run at the same time, a good match for heat recovery plus a modest ground loop.
Every result shows its sources and what would change the answer.
1Intro CallA conversation about your site. No paperwork.
2Quick ScreenPublic data only. No NDA.
3Mutual NDAOnce it looks worth pursuing.
4Detailed Screen or Full StudyBuilt on your real data.
5Your DecisionOwn it, or pay for heat as a service.
Fastest first look

Quick Screen

Detail

Follows a short intro call. Public information only: no NDA and nothing to send us.

  • Is your site worth a closer look?
  • Likely system type and scale
  • Early outlook on economics and incentives
Request a quick screen
More depth

Detailed Screen

Detail

Once we have talked, and usually after the quick screen, we sign a mutual NDA and you share your bills, load data and site details.

  • Sizing built on your real loads
  • Ground loop, heat recovery and backup design
  • Engineering and cost ranges, and what drives them
Start the conversation
Best answer, soonest

Full Study

Detail

Want the fullest answer right away? After an intro call and a mutual NDA, commission a complete feasibility study from the start.

  • Detailed engineering and site work
  • Ownership and service priced side by side
  • A decision-ready answer, as fast as possible
Talk to us about a study

Go deeper 300 ft

Explore the details


Photo credits. Agriculture, Industrial and Commercial photos via Pexels, free to use under the Pexels license. Ground loop: Mark Johnson, released into the public domain, via Wikimedia Commons (source). Diagrams, map and chart drawn by Fifty Under; price data from the U.S. Energy Information Administration.